Home        About Us        Services        Projects        Contact Us        Green/LEED

 

RESTORATION & RENOVATION

                                                    (BEFORE & AFTER)                                     < BACK


EPCON  

Eden Prairie, MN  

This Eden Prairie Convenience Center received a major exterior remodel. We installed new railings landscaping, and used a highly engineered Helica screw and shot-Crete system to hold the soils in place, then we created two (2) tiers of retaining walls.


WELLS FARGO PLAZA

Bloomington, MN  

EXTERIOR RENOVATIONS

The Wells Fargo Plaza (WFP) project was a $2.5 million renovation of the first and second floor elevator lobbies and connecting entry link, all completed while the building was occupied and tenant accessibility maintained. The project also included exterior canopy improvements, as well as the addition of twenty-four, ten-foot stainless steel chevrons mounted at the top of the building. The Bainey Group worked closely with the building management and the Midwest Peregrine Society to install these without disrupting the nesting pair of peregrine falcons that call the top of WFP home. The LED lighting technology incorporated in the chevrons adds a beautiful luminescent feature to the Bloomington skyline.

Before... After...

ELEVATOR LOBBY RENOVATIONS

While the old elevator lobbies had a dark, more confined feeling to them, the newly remodeled lobbies have a bright, more open feel. This was accomplished with the installation of anigre wood paneling, Fiorito Rojo marble flooring and elevator columns, and the use of art glass, bronze, and indirect lighting in the space. Two floor openings were also created between the first and second floor west elevator lobbies to give a sense of special recognition for those entering the building. Major structural work was accomplished in the first floor restaurant ceiling to create these openings while still maintaining the grills and serving line.

 

Before...

After...

ENTRY/COMMON AREA RENOVATIONS

The most radical change occurred in the entry connecting link, where the existing second floor was removed, and new structural members were added to support a second floor walkway and the a new and expanded two-story art glass curtain wall. A two-story marble water feature was also added to this space making the area a calming welcoming front entry environment. This work also opened the area to make a wonderful space for the building to hold special events, as the banding of the peregrine falcon chicks. Quite a change from the old dark tunnel effect of the old entry.

Before...

After...


Top of Page

MN AUTISM CENTER

Rochester, MN  

This fast-track project will take place over the course of 6 weeks and will transform a dated communications building to a new treatment facility for autistic children and young adults that will include updated exterior facades, security, and exterior play area. In addition, a new gymnasium, cafeteria and classrooms that will harbor creative and innovative treatment  to enhance the education and social skills of students from ages 2 through 21 in a one-on-one environment. Please stay tuned for updated reports on this project in the spring as we present an update on this facility.

Before...

After...


Top of Page

GROVE SHOPS - MAPLE GROVE MALL

Maple Grove, MN  

The improvements at Grove Shops, involved updating a 1980’s exterior façade, to a modernized façade, including new EIFS system, prefinished metal paneling, aluminum and glass storefronts, and down-lighting. In addition, the West end of the building was converted from one large tenant space to three smaller tenant spaces which now presents tenant’s storefronts and signage to the city’s main infrastructure, rather than a side-street. This project was completed in 8 weeks.

Before...

After...


Top of Page

COUNTRY VILLAGE MALL

Minnetonka, MN  

A major renovation consisting of new sidewalks with stamped concrete elements combined with multicolored sign bands help create a new look for this landmark shopping center. New exterior lighting & monument signs also give the center a more up-to-date look. This project took approximately 4 months to complete while keeping the center open during normal business hours.

Before...

After...


Top of Page

MAPLE GROVE MEDICAL BUILDING

Maple Grove, MN  

This unique two-story addition replaced a portion of the existing single story-structure that has been a landmark since Maple Grove was just a suburb of Minneapolis. This project involved the construction of new footings and new mechanical and electrical systems. The new design required a combination of mansard roofing and flat roofing to help ease the transition between the new and existing buildings along with brick and EIFS exterior finishes.

Before...

After...


Top of Page

TONIC OF UPTOWN

Minneapolis, MN

We tore the roof off - literally. Added structural steel framing and put a new roof on the building to support roof top dining. Demolition of the entire interior of the previously resided Lakeland Dental Academy. Everything in the building, with the exception of the four exterior walls, is new including the electrical, mechanical and fire systems. The exterior walls were brought back to the original brick. There are four bars, two lounges, a dance floor, full kitchen for upscale dining, banquet room, decorative brickwork, catwalk overlooking the main dining room and a 26-foot tall ceiling on the 2nd-floor. Along with the rooftop dining with unobstructed views and an impressive array of materials and finishes throughout, it is now one of the hottest new restaurant/nightclubs in the city. 

Before...

After...


Top of Page

BARNES & NOBLE

Minnetonka, MN  

Expanded the mall location in Minnetonka, MN to 35,000 square-feet and raised the roof five feet for the new store design. During construction we maintained services to the retail clients on both sides of the project. Barnes & Noble was completed in September 2004.

Before...

After...


Top of Page

PROMETRIC

Edina, MN  

Complete January of 2001 this project is 63,000 square feet and developed by GSB Developments.

Before...

After...


Top of Page

GN RESOUND

Bloomington, MN  

120,000 square feet, Completed March of 2001, Upscale Tenant Improvement.

Before...

After...


Top of Page

WHITEWATER OFFICE CENTER I & II

Minnetonka, MN  

Major renovation of two buildings; restrooms, hallways, elevators and atriums. Also added Minnesota limestone to the exterior entrances. 54,000 square-feet. Complete December of 2003.

Before...

After...


Top of Page

THE BAINEY GROUP, INC.

Plymouth, MN  

When The Bainey Group decided to build its new corporate offices, the goal was to express the core values of the company and display the true quality and craftsmanship that only their clients had experienced to date. The offices were designed not only as a showcase for construction materials, methods, and products, but also to demonstrate how an energetic design can affect the daily work environment in a positive way.

Before...

After...


Top of Page

"Built As If It Were Our Own...®"

The Bainey Group, Inc. 14700 28th Avenue North  Suite 30  Plymouth, MN  55447

 Main: 763-557-6911  Fax: 763-557-7204

All Rights Reserved. Copyright © 1994. The Bainey Group, Inc

  BEFORE & AFTER

     Prometric

     GN Resound

     Barnes & Noble

     Tonic of Uptown

     MN AUTISM CENTER

     MAPLE GROVE mall

     WELLS FARGO PLAZA

     The Bainey Group, Inc.

     Country Village mall

     Whitewater Offices I & II

     Maple Grove Medical Bldg.  

PROJECTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

                                                                    Office/Tenant Improvements | Industrial | Restaurants | Office Buildings  | Office/Warehouse  

                                                                   Salon & Spas | Worship | Education | Medical & Dental | Financial | Retail | Condo's |Marina's

                                                            Small & Other Jobs | Fast Food Restaurants | Renovation & Restoration  (Before & After) | Entertainment